Question: Are the Psi-values generated by AutoPSI considered accurate for direct use in formal SAP submissions, or are they only indicative?
Answer: Calculations completed within AutoPSI are fully accurate and acceptable for direct use in SAP submissions. The software completely satisfies industry standards, meeting both BR497 and BS EN ISO 10211:2017 Annex C criteria
How to utilize these calculations:
Step 1: Complete your junction thermal bridging calculations directly within the AutoPSI platform.
Step 2: Extract the approved Psi-values generated by the software.
Step 3: Input the final values directly into your formal SAP submission documentation.
Tip: AutoPSI collaborates closely with accreditation schemes like Elmhurst to provide comprehensive training on utilizing the software effectively.
Tags: SAP Submissions, Psi-Values, Compliance Standards, BR497, ISO 10211